原子能科学技术Issue(z2):917-920,4.DOI:10.7538/yzk.2014.48.S1.0917
CPR1000先进主控室布置设计及差异性分析
General Layout Design and Difference of CPR1000 Advanced MCR
栾语 1程波 1邹杰 1梅世柏 1孙永滨 2陈卫华1
作者信息
- 1. 深圳中广核工程设计有限公司,广东 深圳 518045
- 2. 北京广利核系统工程有限公司,北京 100094
- 折叠
摘要
Abstract
The general layout of the advanced main control room (MCR) was designed to make the monitor and control equipment in MCR in the best combination to provide the operators with the concentrate information and means ,so the operators and the sys‐tem can perform at their best .The principle and method of the MCR general layout and the difference between the CPR1000 built projects and new projects were analyzed in this paper .关键词
主控室/综合布置/核电厂Key words
main control room/general layout/nuclear power plant分类
信息技术与安全科学引用本文复制引用
栾语,程波,邹杰,梅世柏,孙永滨,陈卫华..CPR1000先进主控室布置设计及差异性分析[J].原子能科学技术,2014,(z2):917-920,4.