| 注册
首页|期刊导航|原子能科学技术|核电厂控制器人因工程验证准则和方法探讨

核电厂控制器人因工程验证准则和方法探讨

杨华龙 刘燕子 贾明 黄伟军

原子能科学技术Issue(z2):1042-1047,6.
原子能科学技术Issue(z2):1042-1047,6.DOI:10.7538/yzk.2014.48.S1.1042

核电厂控制器人因工程验证准则和方法探讨

Discussion on Verification Criterion and Method of Human Factors Engineering for Nuclear Power Plant Controller

杨华龙 1刘燕子 1贾明 1黄伟军1

作者信息

  • 1. 深圳中广核工程设计有限公司,广东 深圳 518045
  • 折叠

摘要

Abstract

In order to prevent or reduce human error and ensure the safe operation of nuclear power plants ,control device should be verified from the perspective of human factors engineering (HFE) .The domestic and international human factors engineering guidelines about nuclear power plant controller were considered ,the verification crite‐rion and method of human factors engineering for nuclear power plant controller were discussed and the application examples were provided for reference in this paper .The results show that the appropriate verification criterion and method should be selected to ensure the objectivity and accuracy of the conclusion .

关键词

人因工程/控制器/验证/核电厂

Key words

human factors engineering/controller/verification/nuclear power plant

分类

信息技术与安全科学

引用本文复制引用

杨华龙,刘燕子,贾明,黄伟军..核电厂控制器人因工程验证准则和方法探讨[J].原子能科学技术,2014,(z2):1042-1047,6.

原子能科学技术

OA北大核心CSCDCSTPCD

1000-6931

访问量0
|
下载量0
段落导航相关论文