中国电机工程学报Issue(16):2684-2691,8.DOI:10.13334/j.0258-8013.pcsee.2014.16.019
基于负荷重构策略的火电切负荷调峰方法
A Load Shedding Method for Thermal Power Plants With Peak Regulation Based on Load Reconstruction Strategy
摘要
Abstract
In short-term operation of thermal power plants, the conventional methods can not meet requirements of complex time coupling constraints and deep load adjustment. To solve this problem, this paper presented a load shedding method for thermal power plants to do peak regulation based on load reconstruction strategy. Load reconstruction strategy consists of three parts:load tendency simulation, load zoom by equal proportion and load modification by ramp rate. A new load curve, which will be later adopted by load shedding method, is got by load reconstruction strategy depending on time coupling constraints. Moreover, to satisfy other operation constraints, dynamic adjusting strategy for the generation schedules was also embedded in load shedding method. The proposed method has been implemented to the optimal operation of thermal system directly operated by East China Grid and feasible operation scheduling of generation units can be obtained. Compared to conventional methods, the proposed method can achieve better peak regulation effects and is effective and successful in dealing with complex constraints and load adjustment demands.关键词
电力系统/调峰/负荷重构/火电/切负荷Key words
power systems/peak load regulation/load reconstruction strategy/thermal power/load shedding分类
信息技术与安全科学引用本文复制引用
王嘉阳,申建建,程春田,陆建宇,励刚..基于负荷重构策略的火电切负荷调峰方法[J].中国电机工程学报,2014,(16):2684-2691,8.基金项目
国家杰出青年科学基金项目(51025934);国家自然科学基金项目(51209031);中国博士后科学基金特别资助(2013T60284)。. National Science Found for Distinguished Young Scholars of China (51025934) (51025934)
Project Supported by National Nature Science Foundation of China (51209031) (51209031)
China Postdoctoral Science Special Foundation (2013T60284) (2013T60284)