| 注册
首页|期刊导航|中国防汛抗旱|岗南、黄壁庄水库“1996.8”洪水联合调度分析

岗南、黄壁庄水库“1996.8”洪水联合调度分析

石宝红

中国防汛抗旱Issue(4):14-16,20,4.
中国防汛抗旱Issue(4):14-16,20,4.

岗南、黄壁庄水库“1996.8”洪水联合调度分析

Integrated Flood Dispatching Management-A Case Study on“1996.8”Flood Disaster in Gangnan and Huangbizhuang Reservoirs

石宝红1

作者信息

  • 1. 河北省黄壁庄水库管理局,石家庄050224
  • 折叠

摘要

Abstract

In August 1996, Hutuo-River experienced a heaviest flood since 1963. Gangnan and Huangbizhuang reservoirs failed to dispatch floodwater because the reservoirs were dangerous and below flood design standard, therefore the flood caused emergency situation to the dam. After“96.8”flood disaster, the dangerous dams in two reservoirs were strengthened to achieve the flood design standard. Based on the actual situation and flood dispatch pattern in reservoirs,“96.8”flood dispatch scheme was simulated and analyzed. This paper proposed suitable techniques for flood dispatching in Gangnan and Huangbizhuang reservoirs to mitigate the losses from flood disasters.

关键词

岗南水库/黄壁庄水库/“1996.8”洪水/防洪/联合调度

Key words

Gangnan reservoir/Huangbizhuang reservoir/“1996.8”flood disaster/flood defence/integrated flood dispatching management

分类

建筑与水利

引用本文复制引用

石宝红..岗南、黄壁庄水库“1996.8”洪水联合调度分析[J].中国防汛抗旱,2014,(4):14-16,20,4.

中国防汛抗旱

1673-9264

访问量0
|
下载量0
段落导航相关论文