| 注册
首页|期刊导航|中国机械工程|基于模糊优选模型的桥式起重机节能评价

基于模糊优选模型的桥式起重机节能评价

叶伟 童一飞 李向东

中国机械工程Issue(12):1630-1633,1638,5.
中国机械工程Issue(12):1630-1633,1638,5.DOI:10.3969/j.issn.1004-132X.2014.12.013

基于模糊优选模型的桥式起重机节能评价

Bridge Crane Energy-saving Evaluation Based on Fuzzy Optimization Model

叶伟 1童一飞 1李向东2

作者信息

  • 1. 南京理工大学,南京,210094
  • 2. 江苏省特种设备安全监督检验研究院,南京,210003
  • 折叠

摘要

Abstract

Based on energy consumption of a bridge crane in “full life cycle” ,this paper put forward bridge cranes energy saving evaluation index system .Rough set theory knowledge was adopted to re-duce the index of the bridge crane energy saving evaluation index system .The optimized bridge crane energy saving index system could be obtained after reduction and all index weights were acquired as well .Finally the fuzzy optimization theory was applied to build energy-efficient evaluation model of the bridge crane and this model was used to evaluate the energy consumption of the overhead crane .This paper selected five bridge cranes of different designs and materials and analyzed their advantages as well as disadvantages of power consumption .Via calculation and analyses ,the optimal design of energy saving of bridge can be obtained and it may provide a reference for the bridge crane design and manu-facturing .

关键词

起重机/指标体系/模糊优选模型/节能评价

Key words

crane/index system/fuzzy optimization model/energy-saving evaluation

分类

机械制造

引用本文复制引用

叶伟,童一飞,李向东..基于模糊优选模型的桥式起重机节能评价[J].中国机械工程,2014,(12):1630-1633,1638,5.

基金项目

国家质量监督检验检疫总局科技计划资助项目(2012QK178);江苏省质量技术监督局科技项目(KJ122717);江苏省博士后科研资助计划项目(0901041C );南京理工大学“卓越计划紫金之星”资助项目 ()

中国机械工程

OA北大核心CSCDCSTPCD

1004-132X

访问量0
|
下载量0
段落导航相关论文