“梯-潭”型泥石流排导槽研究初析

李云 陈晓清 游勇 王飞

灾害学Issue(4):173-175,3.
灾害学Issue(4):173-175,3.DOI:10.3969/j.issn.1000-811X.2014.04.032

“梯-潭”型泥石流排导槽研究初析

Preliminary Study on Debris Flow Drainage Channel with Step-pool Configuration

李云 1陈晓清 2游勇 1王飞1

作者信息

  • 1. 中国科学院·水利部成都山地灾害与环境研究所,中国科学院 山地灾害与地表过程重点实验室,四川 成都610041
  • 2. 中国科学院大学,北京 1 0049
  • 折叠

摘要

Abstract

A debris flow drainage channel with step-pool configuration (DCSC)for the small watershed with high gradient and abundant loose mass is proposed.The working principles are analyzed after a detailed introduc-tion of the structure of DCSC.The analyses show that the DCSC has its advantages in abrasion and scouring for the engineering mitigation in the disaster areas.The research findings results could provide reference for the further ex-ploration of DCIS such as the dynamic behavior of the channelized debris flow,the energy loss mechanism of debris flow in step-pool system and parameter determination,which are of great significance to improve the techniques lev-el and enlarge the application range of mitigation engineering.

关键词

汶川地震/狭陡沟道/阶梯-深潭系统/泥石流排导槽/梯-潭槽

Key words

Wenchuan earthquake/narrow-steep gully/step-pool system/debris flow drainage channel/channel with step-pool configuration

分类

信息技术与安全科学

引用本文复制引用

李云,陈晓清,游勇,王飞..“梯-潭”型泥石流排导槽研究初析[J].灾害学,2014,(4):173-175,3.

基金项目

国家科技支撑计划(2011BAK12B03);国家重点基础研究发展计划“九七三”计划 ()

灾害学

OACSCDCSTPCD

1000-811X

访问量0
|
下载量0
段落导航相关论文