燃气-蒸汽联合循环机组的汽轮机启动过程优化
Optimization on Start-up Process of Steam Turbine in Combined Cycle Generating Units
陈坚红 1顾正皓 2张梦可 1丁阳俊 2毛志伟 2盛德仁1
作者信息
- 1. 浙江大学热工与动力系统研究所,杭州 310027
- 2. 国网浙江省电力公司电力科学研究院,杭州 310014
- 折叠
摘要
Abstract
For accelerating the start-up speed of steam turbine, shortening the warming-up time and improv-ing peak-shaving capacity of gas-steam combined cycle generating units, a two-dimensional axis symmetric model of steam turbine rotor is established, which obtains variation regularity of rotor stress during start-up by numerical simulation. On the basis of finite element calculation, the DCS configuration method is adopted to achieve online calculation and monitoring of units stress, and then the startup process is optimized. Compared with the original warm start-up process, the quick start-up process after optimization can shorten starting time by 40 minutes and annually increase economic benefit of 3.06 million yuan.关键词
联合循环/汽轮机/转子应力/DCS 控制/优化Key words
combined cycle/steam turbine/rotor stress/DCS control/optimization分类
能源科技引用本文复制引用
陈坚红,顾正皓,张梦可,丁阳俊,毛志伟,盛德仁..燃气-蒸汽联合循环机组的汽轮机启动过程优化[J].浙江电力,2014,(10):40-44,5.