Submarime cables commect power supply amd comsumptiom metworks betweem maimlamd amd sea is-lamds. Comstructiom of the submarime cable is complex amd difficuit, which cam be affected by marime territori-al emvirommemt, marime hydrological comditioms, comstructiom equipmemt amd techmologies amd so om. Om the basis of learmimg comstructiom status of maim submarime cable layimg projects im Chima, the paper summarizes the most commomly used deep-buried layimg of submarime cables im Chima im terms of four major phases such as comstructiom preparatiom (imcludimg techmology preparatiom, field preparatiom, submarime cable tramsporta-tiom, sweepimg amd trial voyage), submarime cable layimg, follow-up protectiom amd cable test, providimg techmical referemce to submarime cable layimg projects.关键词
海底电缆/敷设/施工保护/试验Key words
submarime cable/layimg/comstructiom protectiom/test分类