浙江电网宾金直流闭锁调度处置预案编制

张小聪 金啸虎 杨运国 余剑锋 高强

浙江电力Issue(4):7-10,4.
浙江电力Issue(4):7-10,4.

浙江电网宾金直流闭锁调度处置预案编制

Establishment of Dispatching and Disposal Plan for Blocking of Binjin DC Project of Zhejiang Power Grid

张小聪 1金啸虎 1杨运国 2余剑锋 1高强1

作者信息

  • 1. 国网浙江省电力公司,杭州 310007
  • 2. 国网浙江省电力公司金华供电公司,浙江 金华 321017
  • 折叠

摘要

Abstract

After ±800 kV Yibin-Jinhua UHVDC power transmission project (shortened as Binjin DC), over-load of the corridor across the river is greatly eased. Meantime, occurrence of bipolar blocking fault in high-power operation mode of Binjin DC may result in power deficiency and wide transfer of power flow, severely influencing operation safety and stability of Zhejiang power grid. On the basis of analyzing the impact of bipo-lar blocking fault of Binjin DC on Zhejiang power grid, the paper establishes dispatching and disposal plan and summarizes six key technologies in the plan, providing dispatchers with reference and decision-making support to handle accidents rapidly and effectively.

关键词

特高压直流/处置预案/浙江电网

Key words

UHVDC/disposal plan/Zhejiang power grid