±800 kV金华换流站换流变压器现场局部放电试验

杨智 谷小博 李晨

浙江电力Issue(6):9-12,4.
浙江电力Issue(6):9-12,4.

±800 kV金华换流站换流变压器现场局部放电试验

On-site Partial Discharge Test of Converter Transformer in ±800 kV Jinhua Converter Station

杨智 1谷小博 1李晨1

作者信息

  • 1. 国网浙江省电力公司电力科学研究院,杭州 310014
  • 折叠

摘要

Abstract

±800kV Xiluodu left shore-Zhejiang Jinhua EHV DC transmission project is the second "±800 kV and 8000 MW" EHV DC transmission project of SGCC. Jinhua station is the first EHV DC converter station in Zhejiang province. Complex insulation structure, high voltage class and complex environment of on-site partial discharge require good testing conditions and anti-interference measurement. This paper introduces ba-sis and method of partial discharge test in Jinhua EHV DC converter transformer and summarizes the problem found in the test, providing experience for converter transformer commissioning in the future.

关键词

换流变压器/局部放电/抗干扰/直流输电

Key words

converter transformer/partial discharge/anti-interference/DC transmission