湖南工业大学学报Issue(2):31-37,7.DOI:10.3969/j.issn.1673-9833.2015.02.006
悬挑十字交叉基础梁节点荷载分配方法探讨
Investigation on Load Distribution of the Joint of Cantilever Crossed Foundation Beam
摘要
Abstract
Semi-infinite beam is extended from free end to infinitely long beam. Based on solutions for infinitely long beam on Winkler foundation, the shear force and bending moment at the free end of semi-infinite beam under the concen-trated couples are derived. The external load applied at the free end is obtained by using the condition of the free end to meet zero moment and zero shear. The deflections at the action points are calculated separately under external loads and concentrated couples and the deflection at the action points are calculated under superposition of concentrated couples and external loads, and the calculation formula for cantilever influence coefficient with the action of concentrated couple is presented. According to the conditions of static equilibrium and deformation compatibility, general formulas for distribute load on joints of cantilever crossed foundation beams under vertical load and moments are given.关键词
Winkler地基/十字交叉基础梁/半无限长梁/节点/荷载分配Key words
Winkler foundation/crossed foundation beam/semi-infinite beam/joint/load distribution分类
建筑与水利引用本文复制引用
林丽萍,罗婉,贺建清..悬挑十字交叉基础梁节点荷载分配方法探讨[J].湖南工业大学学报,2015,(2):31-37,7.基金项目
湖南科技大学研究生创新基金资助项目 ()