深部土与立井井壁竖向相互作用试验台研制及初步应用

张驰 杨维好 王衍森 张涛

采矿与安全工程学报2015,Vol.32Issue(4):578-584,7.
采矿与安全工程学报2015,Vol.32Issue(4):578-584,7.DOI:10.13545/j.cnki.jmse.2015.04.009

深部土与立井井壁竖向相互作用试验台研制及初步应用

Development and preliminary application for test rig of the vertical interaction between deep soil and shaft lining

张驰 1杨维好 1王衍森 1张涛2

作者信息

  • 1. 中国矿业大学深部岩土力学与地下工程国家重点实验室,江苏徐州 221116
  • 2. 辽宁工业大学土木建筑工程学院,辽宁锦州 121000
  • 折叠

摘要

Abstract

In this article, a test rig applying to research on the vertical interaction between deep soil and shaft lining has been developed successfully. Vertical interaction test between saturated sand and C60 concrete shaft lining has been studied preliminarily. The test rig has three main technical parame-ters: the maximum effective test space is 820 mm×820 mm, the maximum pressure capacity is 24 MPa and the maximum depth of research soil is 1 200 m. The vertical shear test between saturated sand and C60 concrete interface shows that when the average interface normal stress is 0.2-0.4 MPa, the shear stress-shear displacement curve can be described by elastic-plastic model. The maximum shear dis-placement is about 0.53-1.11 mm. The ultimate static friction coefficient is 0.70-0.53 and the interface shear strength is 140-210 kPa.

关键词

深部土与井壁/界面相互作用/高压试验台/数值模拟/物理试验

Key words

deep soil and shaft lining/interface interaction/high pressure test rig/numerical simu-lation/experimental analysis

分类

矿业与冶金

引用本文复制引用

张驰,杨维好,王衍森,张涛..深部土与立井井壁竖向相互作用试验台研制及初步应用[J].采矿与安全工程学报,2015,32(4):578-584,7.