人民黄河Issue(8):137-139,3.DOI:10.3969/j.issn.1000-1379.2015.08.036
保德沿黄公路改道工程边坡坡脚冲刷试验
Erosion Experiment on Slope Toe of Diversion Project in Baoder Highway Along the Yellow River
何江 1李玲 2张林忠3
作者信息
- 1. 河南水利与环境职业学院,河南郑州450008
- 2. 无锡市城市防洪工程管理处,江苏无锡214021
- 3. 黄河水利科学研究院,河南郑州450003
- 折叠
摘要
Abstract
Taking the highway diversion project in Fubao section from Xingxian to Baode over the north stream of the Yellow River as back-ground,based on the site survey as well as the analysis of scour and silting evolution and the flood characteristics,the study determined the design flood. Based on the project,the clean-water movable-bed model was used to test the scour depth of river bed at the embankment toe in the case of once-in-fifty-year frequency flood under different project boundary conditions. The results show that the average scour depth of the roadbed is 4. 21m,the maximum scour depth is 9. 04 m,and the deepest position is at the stake K0+500 under the conditions of the em-bankment under the bridge completely washed away;the average scour depth of highway roadbed is 4. 12 m,the maximum scour depth is 7. 56 m,and the deepest position is at the stake K0+800 under the conditions of the embankment under the bridge not washed away.关键词
冲刷深度/实体模型/沿黄公路/府保河段/黄河Key words
scour depth/solid model/highway along the Yellow River/Fubao section/Yellow River分类
建筑与水利引用本文复制引用
何江,李玲,张林忠..保德沿黄公路改道工程边坡坡脚冲刷试验[J].人民黄河,2015,(8):137-139,3.