原子能科学技术Issue(8):1424-1427,4.DOI:10.7538/yzk.2015.49.08.1424
秦山第二核电厂乏燃料水池失去冷却后最短响应时间分析
Minimum Response Time Study of Spent Fuel Pool Lost Cooling for Qinshan NPP-2
洪源平 1叶国栋 1潘泽飞1
作者信息
- 1. 中核核电运行管理有限公司,浙江海盐 314300
- 折叠
摘要
Abstract
In the case of station blackout accident ,the reactor spent fuel pool cooling system had a high risk to break down .In order to avoid the accident without the reactor spent fuel pool cooling going worse ,the minimum time from the spent fuel pool lost cooling to the spent fuel assembly exposing was calculated by using the ORIGEN‐S code .The calculation results show that the minimum time of the worst case is 79.2 h , and the results are also used to establish the emergency response plan for Qinshan NPP‐2 .关键词
乏燃料水池/失去冷却/应急响应Key words
spent fuel pool/lost cooling/emergency response分类
能源科技引用本文复制引用
洪源平,叶国栋,潘泽飞..秦山第二核电厂乏燃料水池失去冷却后最短响应时间分析[J].原子能科学技术,2015,(8):1424-1427,4.