| 注册
首页|期刊导航|中国电机工程学报|基于机会约束规划的虚拟电厂调度风险分析

基于机会约束规划的虚拟电厂调度风险分析

范松丽 艾芊 贺兴

中国电机工程学报Issue(16):4025-4034,10.
中国电机工程学报Issue(16):4025-4034,10.DOI:10.13334/j.0258-8013.pcsee.2015.16.004

基于机会约束规划的虚拟电厂调度风险分析

Risk Analysis on Dispatch of Virtual Power Plant Based on Chance Constrained Programming

范松丽 1艾芊 1贺兴1

作者信息

  • 1. 上海交通大学电子信息与电气工程学院,上海市闵行区 200240
  • 折叠

摘要

Abstract

Chance constrained programming is an effective method for dealing with various uncertain factors, such as power fluctuation of variable generation, error in load forecasting, and the possibility of unit outage resulting from failure, etc, in the operation of virtual power plant (VPP). This paper proposed a dispatch model of VPP based on chance constrained programming theory, which maximized the benefits and considered the constraint of spinning reserve requirement at a given confidence level, and the genetic algorithm based on stochastic stimulation was selected to solve the problem. Considering that there may exist risk that some power demand cannot be met, due to the uncertainty inherent in the chance constrained programming, an index quantifying the risk was presented, and the risk in the VPP scheduling was analyzed in different cases, at different confidence levels and different risk factors. Besides, how to find the balance between benefits and risk of VPP and how to select the best confidence level in chance constrained programming were also discussed.

关键词

虚拟电厂/经济调度/风险分析/机会约束规划/不确定因素/最佳置信水平

Key words

virtual power plant (VPP)/economic dispatch/risk analysis/chance constrained programming/uncertain factors/optimal confidence level

分类

信息技术与安全科学

引用本文复制引用

范松丽,艾芊,贺兴..基于机会约束规划的虚拟电厂调度风险分析[J].中国电机工程学报,2015,(16):4025-4034,10.

基金项目

国家科技支撑计划项目(2013BAA01B04)。 The National Key Technology Support Program (2013BAA01B04) (2013BAA01B04)

中国电机工程学报

OA北大核心CSCDCSTPCD

0258-8013

访问量0
|
下载量0
段落导航相关论文