| 注册
首页|期刊导航|铁道科学与工程学报|海底隧道不同防排水条件下衬砌结构开裂情况研究

海底隧道不同防排水条件下衬砌结构开裂情况研究

雷波 漆泰岳 王睿 陈小雨

铁道科学与工程学报Issue(4):859-865,7.
铁道科学与工程学报Issue(4):859-865,7.

海底隧道不同防排水条件下衬砌结构开裂情况研究

Study on the lining crack of subsea tunnel in the different conditions of waterproof and drainage

雷波 1漆泰岳 2王睿 1陈小雨2

作者信息

  • 1. 西南交通大学 土木工程学院,四川 成都 610031
  • 2. 交通隧道工程教育部重点实验室,四川 成都 610031
  • 折叠

摘要

Abstract

The waterproof and drainage way are not always similar to each other in the different level of surround-ing rock of subsea tunnel,among which the principle of controlled drainage was used in the hard surrounding rock I andⅡ,and the entire plugging method can be applied to the surrounding rock of poor quality,such as the level of Ⅳ and Ⅴ.Based on the XFEM,the actual cracking of Xiamen Subsea Tunnel will be taken in a re-search in different condition of waterproof and drainage,which can be available to provide some useful sugges-tions for the building of other high -pressure tunnels and making cause analysis of lining crack.The research re-sults show that it is not happened to the crack of tunnel lining in the case of controlled drainage of surrounding rock level Ⅱ and the design is reasonable.It also turns out that the outside of arch springing of tunnel lining is cracked in the condition of whole block of surrounding rock level Ⅴ.Both the crushing and cracking of concrete lining will happen under the condition of higher water pressure,which need to be structural reinforced in the rel-evant position of tunnel lining cracks.Besides,based on tunnel lining diseases until now,which mainly are cir-cumferential cracks and located in some parts above the arch wall,it is found that the high water pressure isn’t the main reason of lining cracking of Xiamen subsea tunnel.

关键词

海底隧道/衬砌结构开裂/高水压/扩展有限元法/堵水限排/全封堵

Key words

subsea tunnel/lining crack/high water pressure/XFEM/controlled drainage/entire plugging

分类

交通工程

引用本文复制引用

雷波,漆泰岳,王睿,陈小雨..海底隧道不同防排水条件下衬砌结构开裂情况研究[J].铁道科学与工程学报,2015,(4):859-865,7.

基金项目

国家自然科学基金资助项目(51278423,51478395);中央高校基本科研业务费专项资金资助项目(WSJTU11ZT33);教育部创新团队发展计划资助项目 ()

铁道科学与工程学报

OA北大核心CSCDCSTPCD

1672-7029

访问量0
|
下载量0
段落导航相关论文