860 MW级燃气蒸汽联合循环机组试运常见问题分析与对策
Analysis and Handling During Trial Operation of 860MW Gas-steam Combined Cycle Units
郝云冯1
作者信息
- 1. 中国电建集团湖北工程有限公司,湖北武汉 430040
- 折叠
摘要
Abstract
This paper introduces the common problems arising from 860MW gas-steam combined cycle unit during commissioning and running, analyzes the possible factors that leading to these defects in design, manufacturing, construction and running etc. Also introduces corresponding resolution and effect,and makes a series of recommendations on the defects treatment of other same type of units.关键词
电厂/燃气蒸汽联合循环/汽轮机/问题Key words
power plant/gas-steam combined cycle unit/turbine/problem分类
信息技术与安全科学引用本文复制引用
郝云冯..860 MW级燃气蒸汽联合循环机组试运常见问题分析与对策[J].机电工程技术,2015,(8):40-44,198,6.