| 注册
首页|期刊导航|人民长江|浅谈500 kV氧化锌避雷器不拆引线试验方法

浅谈500 kV氧化锌避雷器不拆引线试验方法

蒋蒴

人民长江Issue(16):72-74,96,4.
人民长江Issue(16):72-74,96,4.DOI:10.16232/j.cnki.1001-4179.2015.16.017

浅谈500 kV氧化锌避雷器不拆引线试验方法

Discussion on test method of 500 kV zinc oxide arrester without disconnecting lead

蒋蒴1

作者信息

  • 1. 国电大渡河流域水电开发有限公司 国电大渡河检修安装有限公司,四川 乐山614900
  • 折叠

摘要

Abstract

In routine direct current test of zinc oxide arrester, it is necessary to disconnect the high voltage lead from the pri-mary winding. Due to the large height of the 3-laminative structure and the heavy lead weight of the 500 kV zinc oxide arrester, it is labor and time consuming to disconnect the high voltage lead in maintenance, which also increases safety risk and mainte-nance costs. Taking a hydropower station as an example, the direct current test methods of the 500 kV zinc oxide arrester with and without disconnecting the leads are introduced. The comparison and analysis of the test figures of the two methods reveal that the method without disconnecting the lead is able to meet the requirements of test specifications.

关键词

不拆引线试验/氧化锌避雷器/避雷器阀片/避雷器直流试验/瀑布沟水电站

Key words

test without disconnecting lead/zinc oxide arrester/valve plate/direct current test/Pubugou Hydropower Station

分类

建筑与水利

引用本文复制引用

蒋蒴..浅谈500 kV氧化锌避雷器不拆引线试验方法[J].人民长江,2015,(16):72-74,96,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文