锦屏一级水电站第四阶段工程蓄水方案优化

朱成涛

人民长江Issue(16):83-86,4.
人民长江Issue(16):83-86,4.DOI:10.16232/j.cnki.1001-4179.2015.16.020

锦屏一级水电站第四阶段工程蓄水方案优化

Optimization of fourth stage impoundment scheme of Jinping I Hydropower Station

朱成涛1

作者信息

  • 1. 雅砻江流域水电开发有限公司,四川 成都610051
  • 折叠

摘要

Abstract

Based on analysis of the design scheme of the fourth stage impoundment of Jinping I Hydropower Station, we pro-posed a new method to optimize the impoundment scheme, in which, a maximum power output model of cascade hydropower sta-tions during impounding period was established and was solved by POA method. Based on the presented optimal dispatching mod-el and the practical inflow process of Yalong River for about 10 years, the new optimization scheme was put forward. The opti-mized scheme was compared with the original design scheme. The result shows that both the two schemes can meet the impound-ment requirement, but the storage capacity of the optimized scheme can increase 950 million m3 , and the generating capacity of downstream cascade hydropower station increase about 860 million kW·h.

关键词

工程蓄水/方案优化/POA法/锦屏一级水电站

Key words

reservoir impoundment/scheme optimization/POA/Jinping I Hydropower Station

分类

建筑与水利

引用本文复制引用

朱成涛..锦屏一级水电站第四阶段工程蓄水方案优化[J].人民长江,2015,(16):83-86,4.