五一水库大坝优化设计的探讨
Discussion on the Design Optimization of the Wu Yi Reservoir Dam
游健 1金葵 1李木凤1
作者信息
- 1. 云南省水利水电勘测设计研究院,云南 昆明 650021
- 折叠
摘要
Abstract
A clay core wall weathered material zoned dam was chosen for WU Yi reservoir through comparison and analysis of the dam types in the early stage according to the geological conditions of the dam site and properties and reserves of local building materials. The design of the dam was optimized later after re-examination of the borrow area and verifi cation by roller compaction test according to the actual geological conditions exposed by foundation excavation taking into account of the borrow planning. The reservoir impounded water up to the normal storage level by September, 2010 and passed thefi nal acceptance in June, 2012. The reservoir has been under proper operation.关键词
五一水库/粘土心墙风化料分区坝/大坝优化设计Key words
Wu Yi reservoir/clay core wall weathered material zoned dam/optimization of dam design分类
建筑与水利引用本文复制引用
游健,金葵,李木凤..五一水库大坝优化设计的探讨[J].云南水力发电,2015,(4):30-33,37,5.