电测与仪表Issue(16):111-116,6.
高压大截面电缆固定金具损耗分析研究
Research of high voltage large cross-section support clamp′s eddy-current loss
游世良 1吴昊 1李建 2刘念 2王利来 2杨凯强2
作者信息
- 1. 四川电力设计咨询有限公司,成都610016
- 2. 四川大学电气信息学院,成都610065
- 折叠
摘要
Abstract
With the acceleration development of cities construction and its expansion,thecities’ power load is increas-ing.The original cities’ overhead transmission line and cable has can’ t meet the needs of city electricity consump-tion.Because the cable can through the tunnels and underground installation, high voltage large cross-section transmis-sion cable install more and more long, thus the largecross-sectionsupport clamp is applied more and more widely.In this paper, we study the loss of high voltage large cross-section transmission cable support clamp, in the case of cur-rent carrying capacity remains the same, the support clamp’ s math model is setup.Through the simulation of SOLID-WORKS and COMSOLsoftwares,finally, we get the impact of the material of support clamp oneddy-current loss.关键词
大截面/电力电缆/固定金具/损耗Key words
large cross-section/cable/support clamp/eddy-current loss分类
信息技术与安全科学引用本文复制引用
游世良,吴昊,李建,刘念,王利来,杨凯强..高压大截面电缆固定金具损耗分析研究[J].电测与仪表,2015,(16):111-116,6.