| 注册
首页|期刊导航|原子能科学技术|秦山第二核电厂1 & 2号机组主蒸汽安全阀改进分析

秦山第二核电厂1 & 2号机组主蒸汽安全阀改进分析

任春明 陈坚刚 黄代顺

原子能科学技术Issue(9):1655-1659,5.
原子能科学技术Issue(9):1655-1659,5.DOI:10.7538/yzk.2015.49.09.1655

秦山第二核电厂1 & 2号机组主蒸汽安全阀改进分析

Analysis of Main Steam Safety Valve Improvement for Qinshan Nuclear Power Plant Phase 2 Unit 1 & 2

任春明 1陈坚刚 2黄代顺3

作者信息

  • 1. 中国核动力研究设计院,四川 成都 610041
  • 2. 中国核动力研究设计院 核反应堆系统设计技术重点实验室,四川 成都 610041
  • 3. 中核核电运行管理有限公司,浙江 海盐 314300
  • 折叠

摘要

Abstract

An improvement for Qinshan Nuclear Power Plant Phase 2 unit 1&2 ,in which the power‐operated valves are replaced with the spring‐loaded valve with setpoint adjustment for the 1st group safety valves of steam generators ,would be adpoted on the basis of comparison with similar improvement implemented in Qinshan Nuclear Power Plant Phase 2 unit 3&4 .The feasibility was evaluated from several aspects ,including mechanical design ,instrument & control design and safety analysis .On the premise of guaranteeing safety ,this improvement can simplify design ,observably reduce project costs and avoid increasing the potential probability of the reactor trip risk induced by complication of the system and control logic .

关键词

秦山第二核电厂/主蒸汽安全阀/改进

Key words

Qinshan Nuclear Power Plant Phase 2/main steam safety valve/improve-ment

分类

能源科技

引用本文复制引用

任春明,陈坚刚,黄代顺..秦山第二核电厂1 & 2号机组主蒸汽安全阀改进分析[J].原子能科学技术,2015,(9):1655-1659,5.

原子能科学技术

OA北大核心CSCDCSTPCD

1000-6931

访问量0
|
下载量0
段落导航相关论文