Abstract
This paper introduces the structure of the distributor in Bailongtan hydropower station and gives a solution for the water leakage of guide vane sleeve seal of bulb tubular unit during the operation and maintenance of the dis-tributor, which not only solves the damp problem of powerhouse gallery(with elevation of 94m),but also ensures the safe and stable operation of the unit.关键词
导叶轴套/百龙滩水电站/密封漏水Key words
guide vane sleeve/Bailongtan hydropower station/water leakage of seal分类