| 注册
首页|期刊导航|山东煤炭科技|孙村煤矿选煤厂原煤系统改造

孙村煤矿选煤厂原煤系统改造

伍华超 季晓明 李宝

山东煤炭科技Issue(9):174-175,2.
山东煤炭科技Issue(9):174-175,2.DOI:10.3969/j.issn.1005-2801.2015.09.83

孙村煤矿选煤厂原煤系统改造

Raw coal system transformation of Suncun coal mine coal preparation plant

伍华超 1季晓明 1李宝1

作者信息

  • 1. 沈阳科迪通达矿山机械有限公司,辽宁沈阳 110013
  • 折叠

摘要

Abstract

According to the problems existing in the production of Suncun coal mine coal preparation plant that the raw coal quality changes is large , the existing production capacity is insufficient, and the aging of equipment is long, upgraded the raw coal system, increased the heavy medium shallow slot row gangue system in the prime sieve workshop, through reasonable selection of equipment and process layout, both to reduce the investment cost, and improve the production capacity and economic beneifts of coal preparation plant.

关键词

改造/重介浅槽排矸系统/滚轴筛/设备/经济效益

Key words

transformation/heavy medium shallow slot discharge system/roller screen/equipment/economic beneifts

分类

矿业与冶金

引用本文复制引用

伍华超,季晓明,李宝..孙村煤矿选煤厂原煤系统改造[J].山东煤炭科技,2015,(9):174-175,2.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文