| 注册
首页|期刊导航|铁道标准设计|哈尔滨南编组站道岔除雪系统设计

哈尔滨南编组站道岔除雪系统设计

李晓兵

铁道标准设计Issue(10):54-60,7.
铁道标准设计Issue(10):54-60,7.DOI:10.13238/j.issn.1004-2954.2015.10.013

哈尔滨南编组站道岔除雪系统设计

The Design of Turnout Snow-removing System for Harbin South Marshalling Yard

李晓兵1

作者信息

  • 1. 铁道第三勘察设计院集团有限公司,天津 300251
  • 折叠

摘要

Abstract

Since the snow on the railway track interrupts the normal switching of turnouts in cold regions, bringing risks to traffic. This paper focuses on the status of turnout snow removing and existing problems at Harbin south marshalling yard, and analyzes the advantages and disadvantages of various ways to remove turnout snow removal both at home and abroad. The best suitable way to remove turnout snow at marshalling yard is determined after comparison and analysis of the economy and safety of three different snow removing alternatives.

关键词

铁路编组站/道岔除雪系统/设计

Key words

Railway marshalling yard/Turnout snow-removing system/Design

分类

交通工程

引用本文复制引用

李晓兵..哈尔滨南编组站道岔除雪系统设计[J].铁道标准设计,2015,(10):54-60,7.

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文