| 注册
首页|期刊导航|铁道标准设计|深埋山岭隧道帷幕注浆段衬砌外水压力研究

深埋山岭隧道帷幕注浆段衬砌外水压力研究

张晓华

铁道标准设计Issue(10):119-122,4.
铁道标准设计Issue(10):119-122,4.DOI:10.13238/j.issn.1004-2954.2015.10.027

深埋山岭隧道帷幕注浆段衬砌外水压力研究

Study on External Water Pressure of Lining in Curtain Grouting Section of Deep-buried Tunnel

张晓华1

作者信息

  • 1. 中铁十八局集团有限公司,天津 300222
  • 折叠

摘要

Abstract

The flow model of deep-buried tunnel is established in this paper to analyze the influence of the external water pressure on the load of supporting system. The two calculation formulas, water pressure on the outer lining structure and the equation of maximum water inflow, are derived from theoretical analysis. On the basis of the obtained equations, this paper addresses the applicability of these equations to the actual tunnel construction. The external water pressure on the outer lining structure is monitored in the curtain grouting section of Taihang Mountain. The monitoring results indicate that though the water pressure on outer lining structure in curtain grouting section is small, continuous monitoring of external water pressure in rich water sections must be reinforced in view of the future increase of water pressure and the safety of tunnel service.

关键词

铁路隧道/山岭隧道/帷幕注浆/外水压力/监测

Key words

Railway tunnel/Mountain tunnel/Curtain grouting/External water pressure/Monitoring

分类

交通工程

引用本文复制引用

张晓华..深埋山岭隧道帷幕注浆段衬砌外水压力研究[J].铁道标准设计,2015,(10):119-122,4.

基金项目

中铁十八局集团有限公司科技开发重点课题(课题编号:中铁十八局(科技)字(2012)-kjkf009) (课题编号:中铁十八局(科技)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文