摘要
Abstract
Based on the study of the transition design for Shanghai-Kunming high-speed railway integrated into Wuguang Yard in Changsha South station of Wuhan-Guangzhou high-speed railway, this paper details the transition design scheme for the high-speed railway line under operation, summarizing the transition methods for the insert of different types of switches as well as the interlocking testing experiences and simulation test of overall signaling system ( interlocking, train control center, CTC, temporary speed restriction, RBC, computer monitoring) .关键词
高速铁路/站场/信号系统/插入道岔/过渡方案/模拟演练Key words
Signaling, High speed railway/Station/Signaling system, Insert switch/Transition scheme/Simulation test分类
交通工程