摘要
Abstract
The DC project construction is of great significance for the realization of optimal allocation of resources and energy optimization of supply. Because the characteristics of the DC project, building for a long time, huge investment, the effect lasting for a long time, it is necessary for making post evaluation for DC project. Combined with DC project evaluation system, starting from the basic principles of the LFA, the targets are decomposed three levels:DC project inputs, outputs, and immediate purpose, which from five aspects:the process evaluation, the economic evaluation, the impact evaluation, the technology evaluation, and the target evaluation. Then, we build the hierarchical logical structure model, and verify the feasibility of the model through DC project examples.关键词
直流工程/后评价/逻辑框架法Key words
DC project/post evaluation/LFA分类
管理科学