基于总入流概念的鄱阳湖设计洪水计算

黄燕 丁志立 郭海晋 吕孙云

人民长江Issue(1):58-60,3.
人民长江Issue(1):58-60,3.DOI:10.16232/j.cnki.1001-4179.2015.01.015

基于总入流概念的鄱阳湖设计洪水计算

Design flood calculation of Poyang Lake based on concept of total inflow

黄燕 1丁志立 1郭海晋 1吕孙云1

作者信息

  • 1. 长江水利委员会 水文局,湖北 武汉430010
  • 折叠

摘要

Abstract

Under the influence of natural evolution of rivers and lakes and human activity, the measured data of controlling sta-tion at outlet of Poyang Lake ( Hukou Hydrological Station) can not meet the demand of consistency and reliability. Moreover, the water regime of the lake area is complicated and the measured date is scare, so the design flood calculation is difficult. There-fore, on the basis of reservoir flood theory, the calculation method of total inflow was introduced. For the runoff of the hydrologi-cal station at tributaries and in the area lack of controlling station, only the propagation time superposition was considered, so as to avoid the influential factors. The calculation result can reflect the actual flood magnitude and temporal-spatial distributions, and it fulfills the demand of flood calculation standard.

关键词

总入流/设计洪水/洪水还原计算/鄱阳湖

Key words

total inflow/design flood/Poyang Lake/flood reduction calculation

分类

建筑与水利

引用本文复制引用

黄燕,丁志立,郭海晋,吕孙云..基于总入流概念的鄱阳湖设计洪水计算[J].人民长江,2015,(1):58-60,3.

基金项目

国家重点基础研究发展“973”计划“长江中游通江湖泊江湖关系演变过程与机制”(2012CB417001) (2012CB417001)

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文