石油钻采工艺Issue(3):111-113,3.DOI:10.13639/j.odpt.2014.03.028
土库曼雅士拉205井产层堵漏解卡工艺
Formation plugging and pipe-stuck freeing technology for Well 205 in Turkmenistan Yashila block
赵建震 1巫道富 2陈鑫 1杨晓冰 1高利华 1张长庚1
作者信息
- 1. 低渗透油气田勘探开发国家工程实验室·川庆钻探钻采工程技术研究院,陕西西安 710021
- 2. 川庆钻探国际工程公司,四川成都 610051
- 折叠
摘要
Abstract
In the Yashila block, Yuratun, Turkmenistan, the limestone reservoir is porous, where there are several pressure systems. During drilling in oil and gas layers, many complexities occurred frequently, such as mud loss, pipe sticking and overlfow. Well 205 is the ifrst exploratory well in this block reaching the design depth of 5 000 m. In this paper, the cause and treatment regarding to mud leakage and drill sticking are analyzed. The shut-in inverse method is used to control and prevent overlfow and blowout. Moreover, stuck pipe-freeing soak, acid soak and injection of fresh water for reducing pressure are used to free the stuck pipe. In this way, the coexistence of mud leakage, drill sticking and overlfow in Well 205 is addressed successfully. The conclusions provide good reference for subsequent exploration and development operations in this block.关键词
井漏/压差卡钻/处理/土库曼斯坦Key words
mud leakage/differential pressure sticking/treatment/Turkmenistan分类
能源科技引用本文复制引用
赵建震,巫道富,陈鑫,杨晓冰,高利华,张长庚..土库曼雅士拉205井产层堵漏解卡工艺[J].石油钻采工艺,2014,(3):111-113,3.