城市建筑Issue(20):28-28,32,2.
浅析人工挖孔桩施工中的若干问题处理
On Countermeasures for the Problem in the Manual Hole Digging Pile Construction Process
王朝鲜1
作者信息
- 1. 云南众基建筑工程有限公司,云南 昆明 650106
- 折叠
摘要
Abstract
With the continuous needs of the developments of construction industry, Manual hole digging pile have the advantages of easy construction with construction , fast operating process and it has been widely used.Combined with his own practice,the author puts forward some certain experience in the practice of manual hole digging pile, whichsolving some technical issues in the process of digging pile, and achieved good results, offered the reference for the same trade or occupation .关键词
人工挖孔桩/施工技术/问题措施Key words
manual hole digging pile/construction technol ogy/issues and measures引用本文复制引用
王朝鲜..浅析人工挖孔桩施工中的若干问题处理[J].城市建筑,2012,(20):28-28,32,2.