上跨既有线斜拉桥施工控制关键技术

虞童儿

城市建筑Issue(2):113-113,115,2.
城市建筑Issue(2):113-113,115,2.

上跨既有线斜拉桥施工控制关键技术

Key Technology Across Existing Lines in Cable-stayed Bridge Construction Control

虞童儿1

作者信息

  • 1. 宁波市城市基础设施建设开发公司,宁波 315300
  • 折叠

摘要

Abstract

In Ningbo Fuming road the bridge span across Ni-ngbo East Railway Station is a cable-stayed bridge with double cable planes of the Twin Towers 55+45+220+45+55=420m. Main beam using hybrid girder, the two sides across the prest-ressed concrete box girder, in the range of 197.2m with steel box girder, steel girder and prestressed concrete box girder intersection position is 2m long steel-concrete joint section, half floating system. The main girder span Ningbo East Rail-way Station location across the Ningbo-Taizhou-Wenzhou rai-lway line 2, and line 5; across the bus full of line 5, parking line 7; span and auxiliary station line 2 and the basic platform and the intermediate platform. In view of main girder cross lines, tower close to existing lines, the characteristics of organization and coordination are difficult, mid-span steel girder construction scheme with a push of the tower, tower construction technology with hydraulic climbing formwork.

关键词

上跨既有线/斜拉桥/钢箱梁/索塔/施工控制

Key words

existing line on the top/cable-stayed bridge/steel box girder/pylon/construction control

引用本文复制引用

虞童儿..上跨既有线斜拉桥施工控制关键技术[J].城市建筑,2013,(2):113-113,115,2.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文