城市建筑Issue(2):280-280,283,2.
水电站双曲拱坝施工技术的探讨
Discussion on the Construction Technology of Double Curvature Arch Dam Hydropower Station
蒋运良 1何文光1
作者信息
- 1. 浙江省正邦水电建设有限公司,杭州310051
- 折叠
摘要
Abstract
This paper first describes the basic situation of a h-ydropower station, analyzes the quality problems in constructi-on of stone masonry dam, and the dam construction technolo-gy and quality control are analyzed in detail.关键词
双曲拱坝/质量控制/水电站/施工技术Key words
double-curvature arch dam/quality control/hyd-ropower station/construction technology引用本文复制引用
蒋运良,何文光..水电站双曲拱坝施工技术的探讨[J].城市建筑,2013,(2):280-280,283,2.