| 注册
首页|期刊导航|城市建筑|预防和治理大型发电机组脱硫设备的 GGH(空气换热器)结垢堵塞有效方法

预防和治理大型发电机组脱硫设备的 GGH(空气换热器)结垢堵塞有效方法

王澔

城市建筑Issue(8):265-266,274,3.
城市建筑Issue(8):265-266,274,3.

预防和治理大型发电机组脱硫设备的 GGH(空气换热器)结垢堵塞有效方法

The Effective Ways of Prevention and Management to Manage the Desulfurization Equipment GGH (Gas Gas Heater) Plug Fouling of Large Generating Units

王澔1

作者信息

  • 1. 浙江浙能乐清发电有限责任公司
  • 折叠

摘要

Abstract

The original GGH heat exchanger of FGD desulph-urization equipment of a power generator group in the course of recurrent occur plug fouling, which make the GGH differe-ntial pressure increased, affect the effect of desulphurization. By using the online high-pressure water washing and compre-ssed air purge be able to reduce the differential pressure of the GGH, but aging equipment and use a long time, the ef ect is not very good, and the original chemical cleaning can effect-ively solve the dredge problem of the GGH heat exchanger fo-uling blockage.

关键词

GGH/换热原件/结垢堵塞/化学清洗剂/高压水冲洗/差压Pa

Key words

original GGH heat exchanger/plug fouling/che-mical cleaning agents/high-pressure water washing/the GGH differential Pa

引用本文复制引用

王澔..预防和治理大型发电机组脱硫设备的 GGH(空气换热器)结垢堵塞有效方法[J].城市建筑,2013,(8):265-266,274,3.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文