城市建筑Issue(10):269-269,1.
隧道施工中地面塌陷的原因及其控制
The Reason and Control of Ground Collapse in Tunnel Construction
摘要
Abstract
This paper analyzes the ground surface subsidence process of Shenzhen subway tunnel construction, and studies the above problems, drowns some useful conclusions, hopes having certain guiding significance and reference function for the city subway tunnel construction prevention of surface sub-sidence.关键词
隧道/塌陷/原因/控制Key words
tunnel/collapse/reason/control引用本文复制引用
..隧道施工中地面塌陷的原因及其控制[J].城市建筑,2013,(10):269-269,1.