长沙理工大学学报(自然科学版)Issue(3):68-76,9.
体内体外混合配束连续刚构桥主梁下挠及处治分析
Processing analysis of deflection of main girder for long-span concrete continuous girder bridge with mixed arrangement of internal and external tendons
摘要
Abstract
To eliminate the diseases of excessive deflection of main girder of long-span con-crete continuous girder bridge induced by shrinkage and creep of concrete and prestress loss,a finite element model of a long-span continuous rigid frame bridge in Anhui province was built to analyze the effect of coupling the shrinkage,creep and prestress loss on long-span concrete continuous girder bridge by using creep criteria and temperature change of ANSYS software to simulate shrinkage and creep of concrete,studying the influence of ex-ternal tensioning on preventing deflection of main girder.Analytical method of deflection of main Girder for long-span concrete continuous girder bridge with mixed arrangement of in-ternal and external tendons are obtained.关键词
桥梁工程/主梁下挠/有限元分析/体内体外混合配束/连续刚构桥Key words
bridge engineering/deflection of main girder/finite element analysis/mixed ar-rangement of internal and external tendons/continuous rigid frame bridge分类
交通工程引用本文复制引用
黄学文,胡守旺,刘洋,张建仁,彭晖,席进..体内体外混合配束连续刚构桥主梁下挠及处治分析[J].长沙理工大学学报(自然科学版),2015,(3):68-76,9.基金项目
安徽省交通科技项目(AHGS 2014-5) (AHGS 2014-5)