Abstract

In light of the future situation of large-scale access to distributed generators,a substation optimization method for siting and sizing based on the capacity credit evaluation of the distributed generator (DG) is proposed.First,based on the principle that the reliability of the system remains unchanged before and after DG”s access,a capacity credit evaluation method for DG is proposed from the reliability perspective,which takes the transformer fault and the temporal property of DG”s power supply into consideration.Furthermore,with reference to the weighted Voronoi diagram method,a substation siting and sizing method with DG taken into account is proposed.In the end,both the effectiveness and practicability of the proposed method are verified through comparison and analysis of calculation examples.

关键词

变电站规划/分布式电源/置信容量/评估

Key words

substation planning/distributed generator(DG)/capacity credit/evaluation

引用本文复制引用

葛少云,王世举,路志英,刘洪,冯作栋,卢震..基于分布式电源置信容量评估的变电站规划方法[J].电力系统自动化,2015,(19):61-67,7.

基金项目

国家自然科学基金资助项目(51477116)。This work is supported by National Natural Science Foundation of China(No.51477116) (51477116)