电网技术Issue(4):914-921,8.
考虑环境成本和时序特性的微网多类型分布式电源选址定容规划
Optimal Site Selection and Capacity Determination of Multi-Types of Distributed Generation in Microgrid Considering Environment Cost and Timing Characteristics
摘要
Abstract
Based on timing characteristics of differnet types of loads and distributed generations (DG) as well as environmental perfomances of different types of DG, a planning model for optimal site selection and capacity determination of DG in microgrid, in which environemental cost is taken into account, is built. In the built planning model, the minimization of annual cost of microgrid, including the investment cost for DG, the fuel cost, the cost of network loss and the environment compensation cost, is taken as objective function, and the stochastic power flow based on Monte Carlo simulation is adopted to judge whether the built planning model can meet power flow constraint or not and to calculate the network loss. Finally, the built planning model is solved by genetic algorithm. The reasonableness of the built model is verified by planning results of a 34-bus microgrid system.关键词
微网/时序特性/环境成本/分布式电源/选址定容Key words
microgrid/timing characteristics/environment cost/distributed generation/optimal site selection and capcatiy deterimination分类
信息技术与安全科学引用本文复制引用
徐迅,陈楷,龙禹,程浩忠,倪炜,王自桢,王晓丹..考虑环境成本和时序特性的微网多类型分布式电源选址定容规划[J].电网技术,2013,(4):914-921,8.基金项目
国家重点基础研究发展计划项目(973项目)(2009CB219703) (973项目)