广东电力Issue(9):123-126,4.DOI:10.3969/j.issn.1007-290X.2015.09.023
输电线路杆塔整体可靠度的研究与分析
Research and Analysis on Total Reliability of Power Transmission Line Tower
王松涛 1徐彬 1杨景胜 1柯嘉 1王学群1
作者信息
- 1. 中南电力设计院,武汉 湖北 430071
- 折叠
摘要
Abstract
In order to study total reliability of power transmission line tower,equivalent description method was introduced to handle with the problem,total failure criterion for the tower was defined and moment method for implicit performance function was utilized for calculation and analysis on 500 kV typical direct line tower.Under the working condition of dead load adding wind load with dead load adding icing adding corresponding wind load,reliable index were respectively acquired as 5.586 and 7.334.关键词
整体可靠度/输电线路/输电塔/等价描述方法/矩方法Key words
total reliability/power transmission line/power transmission tower/equivalent description method/moment method分类
建筑与水利引用本文复制引用
王松涛,徐彬,杨景胜,柯嘉,王学群..输电线路杆塔整体可靠度的研究与分析[J].广东电力,2015,(9):123-126,4.