Abstract

For the right access road tunnel section of Xiaorongjiang Hydraulic Complex,reinforcement calculation was conducted by use of SDCAD4.0,the software used for hydraulic tunnel reinforced concrete lining design. Rein⁃forcement calculation and analysis was completed for the 4 typical sections in construction period and operation pe⁃riod respectively,which provide basis for tunnel construction.

关键词

隧洞/配筋计算/施工期/运行期/小溶江水利枢纽

Key words

Tunnel/reinforcement calculation/construction period/operation period/Xiaorongjiang Hydraulic Complex