广西水利水电Issue(3):24-27,4.
龟石水库防洪任务调整的可行性论述
Discussion on feasibility of flood protection task adjustment of Guishi Reservoir
唐金鹏 1李艳平1
作者信息
- 1. 广西水利电力勘测设计研究院,广西 南宁 530023
- 折叠
摘要
Abstract
An introduction was made on the general conditions and current flood control scheme protection task of Guishi Reservoir,based on which the authors analyzed its new flood protection task. It is put forward the flood pro⁃tection capacity of Hezhou City will be upgraded from once in 20 years to once in 50 years by altering flood control scheme,neither increasing main dam height nor affecting beneficial promotion task.关键词
龟石水库/贺州防洪/堤库结合/防洪调度Key words
Guishi Reservoir/flood protection of Hezhou City/united utilization of dike and reservoir/flood control分类
建筑与水利引用本文复制引用
唐金鹏,李艳平..龟石水库防洪任务调整的可行性论述[J].广西水利水电,2013,(3):24-27,4.