| 注册
首页|期刊导航|广西水利水电|百色水文站悬移质输沙率测验方式调整分析

百色水文站悬移质输沙率测验方式调整分析

郭日晶

广西水利水电Issue(4):106-108,3.
广西水利水电Issue(4):106-108,3.

百色水文站悬移质输沙率测验方式调整分析

Adjustment of suspended sediment discharge measurement method at Baise Hydrological Station

郭日晶1

作者信息

  • 1. 百色市水文水资源局,广西 百色 533000
  • 折叠

摘要

Abstract

Flow velocity decrease and silt carrying capacity of river drops due to influence of upstream and down-stream hydraulic works,which renders great influence on sediment measurement at Baise Hydrological Station. Based on analysis of the sediment discharge measurement records over the years,stable comprehensive single-sec-tion sediment curve was calibrated. Results of examination demonstrate its accuracy conforms to requirements of specification and hydrological patrol metering. It can be used for compiling sediment data.

关键词

水利工程/影响/输沙率/测验方式/调整/百色水文站

Key words

Hydraulic work/influence/sediment discharge/measurement method/adjustment/Baise Hydrologi-cal Station

分类

天文与地球科学

引用本文复制引用

郭日晶..百色水文站悬移质输沙率测验方式调整分析[J].广西水利水电,2013,(4):106-108,3.

广西水利水电

1003-1510

访问量0
|
下载量0
段落导航相关论文