Abstract
The six units of Najin Hydropower Station in Tibet have already run for 42 years since been put into opera-tion in 1965,which had been innovated successfully by Nanning Good Fortune Heavy Industries Generating Equip-ment Co., Ltd. in 2006. The paper makes an introduction to the technical innovation of Najin hydropower station, which can be well referenced by similar projects.关键词
水轮机技术改造/水轮机选型/西藏纳金水电站Key words
technical innovation of turbine/type selection of turbine/structural design/Najin Hydropower Station in Tibet分类