电力系统保护与控制Issue(2):49-54,6.
大电网恢复适应性分区方法
Adaptive partition method for large power system restoration
摘要
Abstract
Reasonable restoration subsystem partitioning can increase the restoration efficiency and ensure the reliability. Therefore, it is necessary to analyze the characteristics of power system restoration problem and improve restoration subsystem partition method. Based on the community structure in complex network theory, a new dynamic and adaptive partition method is proposed to solve the subsystem partition problem in power system restoration. The proposed method divides the partition process into agglomerate stage and split stage. The agglomerate stage deals with some special requirements in black start stage and the following split stage finds the tie-line among subsystems. Simulation of Shandong Power Grid shows that the partition scheme formed by this method is feasible and reliable, which complies with the power system operation principle of layering and zoning. Besides, the proposed method can help with the optimal allocation of black start unit.关键词
电力系统恢复/适应性分区/并行恢复/社团结构/复杂网络Key words
power system restoration/adaptive partition/parallel restoration/community structure/complex network分类
信息技术与安全科学引用本文复制引用
刘玉田,谭冰雪..大电网恢复适应性分区方法[J].电力系统保护与控制,2013,(2):49-54,6.基金项目
国家高技术研究发展计划(863计划)资助项目(2011AA05A118) (863计划)