采用保险机制的含风电电力系统短期备用计划的风险转移

刘玉娇 王旭 蒋传文 周晓斌

电力系统保护与控制Issue(9):54-59,6.
电力系统保护与控制Issue(9):54-59,6.

采用保险机制的含风电电力系统短期备用计划的风险转移

Insurance based risk transformation of short-term reserve plan of power system integrated wind energy

刘玉娇 1王旭 1蒋传文 1周晓斌2

作者信息

  • 1. 上海交通大学电气工程系,上海200240
  • 2. 英大长安保险经济有限公司,上海200025
  • 折叠

摘要

Abstract

With integration of large scale wind generation, many power systems utilize the chance constrained reserve plan instead of the traditional one. It brings not only the high utilization of wind energy but also outage risks. The paper thus proposes a risk transformation method with insurances for reserve risks. This paper considers both forecasting error and unit outage loss as stochastic variables to conduct research based on three types of distributions of forecasting errors and four types of distributions of unit outage loss, and to evaluate the risks with their expectation, value at risk and expected shortfall. The example results show that the forecasting error distribution would have decisive roles on the expectations and value at risks with low credit, but the tail loss with small probability including the expected shortfall and value-at-risk with high degree of confidence would be decided by both distributions of forecasting error and unit outage loss. The results also show that the power grid and insurance company can achieve win-win via the risk aversion of insurance mechanism. This work is supported by the National High Technology Research and Development Program of China (863 Program) (No. 2012AA050204).

关键词

备用计划/停电损失/风险评估/风险转移/保险

Key words

reserve plan/outage loss/risk evaluation/risk transformation/insurance

分类

信息技术与安全科学

引用本文复制引用

刘玉娇,王旭,蒋传文,周晓斌..采用保险机制的含风电电力系统短期备用计划的风险转移[J].电力系统保护与控制,2013,(9):54-59,6.

基金项目

国家高技术研究发展计划(863计划)(2012AA050204) (863计划)

电力系统保护与控制

OA北大核心CSCDCSTPCD

1674-3415

访问量4
|
下载量0
段落导航相关论文