| 注册
首页|期刊导航|计算机工程与应用|生物地理学算法求解柔性车间作业调度问题

生物地理学算法求解柔性车间作业调度问题

吴定会 孔飞 朱绍文 纪志成

计算机工程与应用Issue(22):206-213,242,9.
计算机工程与应用Issue(22):206-213,242,9.DOI:10.3778/j.issn.1002-8331.1408-0178

生物地理学算法求解柔性车间作业调度问题

Biogeography-based optimization algorithm for flexible job-shop scheduling problems

吴定会 1孔飞 1朱绍文 1纪志成1

作者信息

  • 1. 江南大学 轻工过程先进控制教育部重点实验室,江苏 无锡 214122
  • 折叠

摘要

Abstract

To solve the multi-objective problem in flexible job-shop scheduling considering the resource constraints of machines and operators, Fuzzy Pareto Dominance-Combined Biogeography-Based Optimization scheduling algorithm (FPDCBBO)is proposed. Using the method of fuzzy Pareto to calculate the dominant degree between the solutions and sorted, updating the global optimal value. Cosine migration model is used to improve the convergence speed of biogeogra-phy-based algorithm. Finally, the algorithm is applied in an actual production instances, the feasibility and efficiency of algorithm are verified.

关键词

柔性作业车间调度/模糊Pareto支配/生物地理学算法/余弦迁移模型/双资源约束

Key words

flexible job-shop scheduling/Fuzzy Pareto Dominance(FPD)/Biogeography-Based Optimization algorithm (BBO)/cosine migration model/double resource constraints

分类

信息技术与安全科学

引用本文复制引用

吴定会,孔飞,朱绍文,纪志成..生物地理学算法求解柔性车间作业调度问题[J].计算机工程与应用,2015,(22):206-213,242,9.

基金项目

国家高技术研究发展计划(No.2013AA040405)。 ()

计算机工程与应用

OA北大核心CSCDCSTPCD

1002-8331

访问量0
|
下载量0
段落导航相关论文