| 注册
首页|期刊导航|有色金属科学与工程|快速浮选提高锌渣中银回收率的试验研究

快速浮选提高锌渣中银回收率的试验研究

黄万抚 王金敏 文金磊 张宏廷

有色金属科学与工程2015,Vol.6Issue(5):85-90,6.
有色金属科学与工程2015,Vol.6Issue(5):85-90,6.DOI:10.13264/j.cnki.ysjskx.2015.05.016

快速浮选提高锌渣中银回收率的试验研究

Increasing silver recovery from zinc leach residue by fast flotation

黄万抚 1王金敏 1文金磊 2张宏廷1

作者信息

  • 1. 江西理工大学资源与环境工程学院,江西 赣州341000
  • 2. 湖南有色金属研究院,长沙410015
  • 折叠

摘要

Abstract

To handle the refractory zinc leach residue out of the high-temperature and high-acid leaching zinc process, the effects of material composition, silver occurrence, the combination collectors and modifiers on the flotation indexes of silver are studied in this paper. The results showe that under the optimal pharmacy system of ammonium dibutyl dithiophosphate and B sulfur nitrogen(2:1) as assemble collector 800 g/t,(NaO3P)6 600 g/t, Na2S 800g/t ,the silver concentrate can be get after open process optimized whose grade is 2 301 g/t with the recovery rate of 57.29 %. The recovery increases by 17.24 % compared to the unoptimized open circuit test (40.05 %). Silver concentrate whose silver grade is 3 087 g/t, recovery rate 5.67 % , and the other silver concentrate whose silver grade is 2 186 g/t, recovery rate 61.23%are achieved by the closed circuit process.

关键词

高温高酸锌渣/银赋存状态/快速浮选/组合捕收剂

Key words

high temperature and high zinc leach residue/silver occurrence/fast flotation/assemble collector

分类

矿业与冶金

引用本文复制引用

黄万抚,王金敏,文金磊,张宏廷..快速浮选提高锌渣中银回收率的试验研究[J].有色金属科学与工程,2015,6(5):85-90,6.

基金项目

国家"十二五"科技支撑计划项目(2012BAB10B03) (2012BAB10B03)

有色金属科学与工程

OACSTPCD

1674-9669

访问量0
|
下载量0
段落导航相关论文