采矿与安全工程学报2015,Vol.32Issue(6):883-888,6.DOI:10.13545/j.cnki.jmse.2015.06.003
基于SOM的深埋厚大矿体采场结构参数优化研究
SOM-based optimization of stope structural parameters of deep & large-sized orebody
摘要
Abstract
Taking the deep & large-sized orebody of Sishanling iron mine as an example, the af-ter-mining block caving filling method has been employed to obtain the optimal structural parameters. With the help of orthogonal experiment, 16 simulation schemes have been designed. Using the FLAC3D to conduct calculation, the interrelated correspondence has been achieved between 5 factors in stope structural parameters and 8 indexes for stop stability. Adopting the unsupervised and competitive study, 16 groups of scheme data have been applied to SOM model for data inputting. Therefore, based on SOM model, the analysis of the prediction for expansion schemes, reversal analysis for structural pa-rameters and the stability-related factors have been done. The results have shown that the length of stope serves as the most influential factor to stability, then the height of stope less influential, while the other factors may not arouse much consideration. The optimal stope parameters for the deep and large-sized orebody in Sishanling iron ore are as follows:100 m level height, 50 m stope length, 15 m room and pillar width and using tailings for backfilling.关键词
SOM技术/深埋厚大矿体/结构参数优化/数值模拟Key words
SOM technique/deep & large-sized orebody/optimization of structural parameters/numerical simulation分类
矿业与冶金引用本文复制引用
徐帅,安龙,李元辉,邬金..基于SOM的深埋厚大矿体采场结构参数优化研究[J].采矿与安全工程学报,2015,32(6):883-888,6.基金项目
国家自然科学基金项目(51204031,51274055) (51204031,51274055)
国家"十二五"科技支撑计划项目(2013BAB02B03) (2013BAB02B03)
教育部基本科研业务费项目(130401007) (130401007)
教育部博士点基金项目(20130042110010) (20130042110010)