辽宁工程技术大学学报(自然科学版)Issue(2):22-25,4.
改进GAP法盾构隧道开挖地表沉降预测
Prediction of ground settlement induced by shield excavation based on improved GAP method
摘要
Abstract
To predict the ground settlement caused by shield tunneling, based on the GAP principle and improved model, this study investigates the characteristics of the ground settlement induced by shield excavation using FLAC2D numerical analysis method. The study results show that with the same shield diameter, when the tunnel depth increases, the maximum surface settlement gradually decreases and the settlement tank gradually widens. There is a linear relationship between tunnel depth and maximum surface settlement. This study results have some reference value and significance on the ground settlement analysis caused by shield tunneling.关键词
盾构隧道/地表沉降/GAP 法/合理埋深/数值模拟/沉降槽/地层损失/沉降预测Key words
shield tunneling/ground settlement/GAP method/reasonable depth/numerical simulation/settlement tank/ground lose/settlement prediction分类
交通工程引用本文复制引用
陶连金,管诚,张印涛,李文博..改进GAP法盾构隧道开挖地表沉降预测[J].辽宁工程技术大学学报(自然科学版),2013,(2):22-25,4.基金项目
北京市自然科学基金重点资助项目(8111001) (8111001)
北京市教委重点基金资助项目(JB004015200901) (JB004015200901)
国家“973”课题基金资助项目(2007CB714203) (2007CB714203)