摘要

Abstract

An idea is that put the primary and second air side of the tube type indirect evaporative cooler in series , and replace the direct evaporative cooling section with indirect evaporative cooler the second air side .With which being applied in tube type indirect evaporative cooler, and then analyse it combining the enthalpy -humidity chart.Based on the testing prototype, combining the concrete experimental data , the changed operation flow is analysed and explained briefly to prove its feasibility .It turned out that the method has a worse cooling effect compared with the two -stage indirect-direct evaporative cooling air conditioning unit .So it is of small significance in practical product development for the unit , now the application of the tube type indirect -direct evapo-rative cooling air conditioning unit is reasonable .

关键词

管式间接蒸发冷却器/改进流程/一次空气/二次空气/节能

Key words

tube type indirect evaporative cooler/improvement process/the primary air/the second air/energy saving

分类

机械制造

引用本文复制引用

..对于管式间接蒸发冷却器改进流程的分析与验证[J].流体机械,2013,(6):65-69,5.

基金项目

陕西省科技统筹创新工程计划项目 ()

流体机械

OA北大核心CSCDCSTPCD

1005-0329

访问量0
|
下载量0
段落导航相关论文